All blogs

You can filter this page to certain types of posts:

Filtered: Showing posts tagged with "mpr" (Remove filter)

February 26, 2008

On February 20, 2008, the new multipurpose room at Skyblue Mesa School was officially opened. This brand new freestanding building is over 11,000 sq ft and features a sophisticated audio/visual system in addition to a state-of-the art student kitchen. This beautiful new addition will serve as an excellent space for performances, meetings, and events on the east side of the district.

The new fully equipped multipurpose room, new two story classroom building, and refurbished turf area are part of a District expansion program chiefly funded by CFD 2005-1.

Skyblue Mesa Grand Opening Video

 

 

Keywords: Grand Opening, MPR, Skyblue Mesa, Video

Posted by News | 0 comment(s) | Share This

February 08, 2008

After months of preparation and hard work, the Skyblue Mesa MPR is nearly complete. This completely new design features a spacious stage, large meeting area, attractive design elements, and a state-of-the-art sound and projection system. This beautiful new addition will serve as an excellent space for performances, meetings, and events on the east side of the district. The grand opening celebration will take place on February 20, 2008 at 8:45am. 

 

Keywords: MPR, Skyblue, Skyblue Mesa

Posted by News | 0 comment(s) | Share This


Elgg powered logo Creative Commons License